From |
To |
|
Position Title |
Description of Project / Work |
Details of Highway construction, improvement and
pavement reconstruction |
|
|
|
|
|
|
06/2013 |
03/2016
Retired |
LCAL
Macau |
Site agent |
Wynne Palace, Macau |
Basement Construction and
Ffit-out work of Back of House |
03/2013 |
06/2013 |
LCAL
Sai Kung
|
Site agent |
Sai
Kung International School |
External Drainage work |
12/2008 |
03/2013 |
LCAL
Lai Chi Kwok
|
Site agent |
Lai
Chi Kwok Transfer Scheme |
Outfall construction |
08/2007 |
12/2008 |
LCAL
Macau |
Sub agent |
City of Dreams, Macau
Construction of a 502,000 sqm luxury resort casino
complex comprising 5 high towers and a 3 storey podium. Hotels: Hard
Rock (46,850m2, 24 floors, 366 rooms), Grand Hyatt (52,850m2, 30 floors,
350 rooms), Hyatt Regency (80,660 m2 26 floors, 660 rooms), Crown
(72,930m2, 31 floors, 295 rooms), Apartment Hotel (136,475m2, 37 floors,
861 rooms), Dragon Theatre (23,3743m2), podium for casino/retail and
food and beverage 187,740m2.
|
External and Landscaping Works of Hotels, including
drainage and pavement construction |
04/2003 |
08/2007 |
LCAL
Central |
Sub agent |
Central Reclamation Phase III - Engineering Works
Reclamation of 18 hectares of land, construction of
seawalls, ferry piers, a railway overrun tunnel, a dual three-lane road
tunnel, a heliport, cooling water pumping stations and pipelines, roads
and drainage and various M&E works.
|
Site formation and construct the associated road and
drainage works, including the extension of a 4 cell box culvert to the
new seafront |
02/2001 |
04/2003 |
LCAL
Tin Shui Wai |
Sub agent |
KCRC Contract CC-230, Light Rail Civil, Permanent Way,
Traction Power and Overhead Line
Light rail civil and systems works for interchange
stations, Tin Shui Wai Phase 4 and Tin Shiu Wai reserve zone extension,
Light Rail grade separations at Pui To Road, junction LT1 and junction
L, modifications to the existing system.
|
Diversion and re-construction of existing road and
modification of existing drainage and sewage system to allow the
construction of new Light Rail |
10/2000 |
02/2001 |
LCAL
Airport
|
Sub agent |
Airport cargo port & runway phase 2 |
Drainage works and runway construction |
04/1999 |
10/2000 |
LCAL
Tseung Kwan O |
Sub agent |
Tseung Kwan O Extension - MTRCL 607 Tseung Kwan O Station
and Tunnels
Construction of an underground station, two cut and cover
tunnels, a public transport interchange and associated substructures, as
well as roadworks adjacent to the station. (project size: 20,000 m2)
|
Tunnel structures and road works adjacent to the station |
03/1998 |
04/1999 |
LCAL
Tsz Oi |
Sub agent |
Redevelopment of Tsz Oi Estate Phase 4
Construction of six 41-storey residential blocks,
comprising 1,920 flats, carpark, kindergarten, footbridges (including
foundations) and external works. (GFA 185,000 m2)
|
All external works including the road, drainage and
sewage system connected to the existing system |
03/1997 |
04/1998 |
LCAL
Fan Ling
|
Sub agent |
Fan
Ling Estate |
All external works including the road, drainage and
sewage system connected to the existing system
|
02/1996 |
03/1997 |
LCAL
Airport |
Sub agent |
LSG Catering Facility at Chek Lap Kok
Design and construction of a 20,500 m2, 3-level facility
incorporating production and returns areas, storage, administration and
maintenance facilities and procurement management of all specialist
equipment
|
All external works including the road, drainage and
sewage system tied in to the main road and drainage system |
07/1995 |
02/1996 |
LCAL
Kau Shat Wan |
Sub agent |
Explosives' Complex - Stage 1 Civil Works
Construction of access tunnels and ten caverns by drill
and blast, reinforced-concrete cavern structures, blast walls, portal
formation, dredging, reclamation, seawalls and site formation at Kau
Shat Wan, Lantau Island.
|
Site formation, road and drainage works |
07/1994 |
06/1995 |
LCAL
Waichai |
Sub agent |
Wanchai Reclamation Phase 1 Reclamation & West Bridge
Dredging, reclamation, seawalls, bridge, pumphouses and
H-pile foundations for the extension to the Hong Kong Convention and
Exhibition Centre.
|
Tie in road and drainage works to existing system |
03/1992 |
06/1994 |
LCAL
|
Senior engineer |
West Kowloon Reclamation Northern
Area - Phase II
Reclamation of 100 hectares involving dredging of 4.2
million m3, deposition of 20 million m3 of sand fill, 1.4 km of seawall,
drainage, demolition, roadworks, foundations and pipelines.
|
Seawall construction and temporary site access road |
06/1990 |
02/1992 |
LCAL
Cheung Sha Wan
|
Senior engineer |
North-west Kowloon sewage treatment and disposal project.
Project involved 2,000 mm steel sewage pipes laying and pump station
access chamber structure.
|
Laying 2000mm diameter MS underground pipe and construct
road and pavement |
07/1988 |
05/1990 |
LCAL
Sha Kei Wan
|
Senior engineer |
Flyover and subways for Hong Kong Island eastern corridor
phase 3. Project involved flyover, subway structure, footbridge, slope
protection works. |
Construction of flyover and subway structures for Hong
Kong Island Eastern Corridor from Sha Kei Wan to Chai Wan
|
07/1987 |
06/1988 |
Slipform
PRC |
Section engineer |
Construction of Guangzhou Shenzhen – Zhuhai super highway |
Road and drainage construction from Guangzhou to Shenzhen
|
04/1986 |
06/1987 |
Tai Fat
Sang Kee
TaiPo |
Site agent |
Slope improvement and road and bridge construction for
phase 2 of Tai Po Road Improvement. Project involved slope improvement,
protection, soil nails, retaining walls, road and drainage
reconstruction, footbridge and car park.
|
To modify Tai Po Road by re-construction of existing road
and drainage, building new footbridge, car park and retaining wall |
06/1981 |
03/1986 |
Kwan
Lee
Shatin |
Site agent |
Reclamation, seawall and road construction at Shatin.
Project involved seawall construction, seawall block casting yard and
box culvert structure
|
Road and drainage work, including box culvert
construction |
11/1978 |
05/1981 |
Maeda
Shatin
|
Quantity surveyor |
Road and drainage work, subway construction and
landscaping works in Shatin |
In charge of all quantity surveying for road and drainage
on site
|
09/1977 |
10/1978 |
UDL
Tuen Mun |
Site engineer |
Reclamation works, road and drainage work at Tuen Mun |
In charge of a site laboratory, carrying out tests on
site formation and concrete cubes test for concrete structure
|